Solutions · Manufacturing

From the production floor to a defensible carbon number.

Map your plants, lines and equipment, bring in electricity and gas from invoices and meters, and turn them into Scope 1 and Scope 2 emissions — then carry the same data into product footprints and reduction plans.

For manufacturers that need plant-level visibility, product-level footprints and evidence that holds up in review.

Explore product footprints

The challenge

Energy data lives in plants; carbon questions arrive from everywhere

Data sits in many places

Invoices, meter exports, ERP purchases and production records rarely line up in one place.

Customers ask about products

Buyers increasingly want the footprint of what you sell, not only your corporate total.

Reductions need proof

Efficiency projects are approved on estimates — few teams can show what actually changed afterwards.

What ErgOps gives manufacturers

One workspace from meter to footprint

Operational hierarchy

Model facilities and assets — production lines, boilers, compressors, chillers, solar systems — and map meters to them.

  • Direct or shared meter mapping, with allocations that total 100%
  • Submeter reconciliation against the parent meter

Energy to Scope 1 and 2

Upload electricity and gas invoices or import meter readings, choose source priority and factors, and run the utility carbon calculation.

  • Only approved invoice values are used
  • Missing data shows as “Needs data”, never as an estimate

Product carbon footprints

Build versioned footprints with bills of materials, allocated production energy, transport and waste.

  • Cradle-to-gate, cradle-to-grave, gate-to-gate or custom boundaries
  • Energy allocated by production quantity, mass or machine hours

Plan and measure reductions

Compare facilities, set targets, rank initiatives by cost per tonne reduced and measure what changed after an action.

  • Benchmarking across comparable facilities
  • Decarbonization planner with a marginal abatement cost curve
  • Verified Impact keeps expected, observed and verified apart

How it works

A practical path for a first plant

01

Model the plant

Add the facility, its main assets and its meters.

02

Bring in energy

Upload invoices or import meter readings, then review and approve.

03

Calculate and compare

Run the utility calculation and compare facilities like for like.

04

Act and prove it

Plan initiatives, assign actions and measure the result.

Framework readiness

Prepare for the frameworks manufacturers meet most

Readiness helps you organize requirements, controls and evidence.

FAQ

Frequently asked questions

Bring plant data and carbon decisions together

Start with one facility and grow into product footprints, targets and framework readiness.

Email Us

In the first meeting, we map your data sources, priority goals and review workflow.